Jump to the main content block

Dangerous Operation Management

  1. Please be cautious not to be electrically overloaded when using various electronic instruments.
  2. Make sure all electrical equipments are electrically connected properly, grounded and in good working conditions.
  3. When using electricity in a wet, damp location or drinking fountain, an earth-leakage circuit breaker (ELCB) must be used. 
  4. Use extension cords having three-prong plugs.
  5. Don't plug multiple extension cords together.
  6. Each department shall inspect the electrical equipment in accordance with the " Self-inspection Sheet for Low-Voltage Electrical Equipments" every six months, and keep the record for 3 years for future reference. Please resolve the electrical problems as soon as possible to ensure the safety.